Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Structural Steel Buildings
Created with Pixso. Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital

Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital

Brand Name: KXD
Model Number: KXD-462
MOQ: 200 M2
Price: USD 50-100 per sqm
Delivery Time: 25 day
Payment Terms: ,T/T,L/C
Detail Information
Place of Origin:
CHINA
Certification:
ISO CE BV SGS
Material:
Steel
Type:
Industrial
Usage:
Buildings
Cost:
Moderate
Design Options:
Flexible
Construction Time:
Short
Packaging Details:
seaworthy package
Supply Ability:
20000 tons/month
Highlight:

prefabricated steel industrial buildings

,

prefabricated pre engineered steel buildings

,

industrial pre engineered steel buildings

Product Description

Basic Info.

Model NO.
KXD-462
Feature
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install
Online Guidance
Design Parameter
Wind Load, Snow Load and Earthquake
Door
Sliding Door or Rolling Door
Wall and Roof Sandwich Panel
EPS, Rock Wool, Glass Wool, PU
Window
Aluminum Alloy Window
Surface Processing
Galvanized
Wind Resistance
Grade 14
Earthquake Resistance
Grade 10
Installation
Installation Drawing or Guide on Site
Transport Package
Flat Packed in Container or as Request
Specification
SGS/ISO/BV
Trademark
Carbon Structural Steel, KXD
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
10000 ton/Month



 







Product Description


Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital 0

The advantages of steel structure high-rise buildings are as follows:
1. Strength and Durability: Steel is known for its high strength-to-weight ratio, making it an excellent choice for constructing tall buildings. Steel structures can withstand heavy loads, such as wind and seismic forces, without compromising thei integrity.
2. Design Flexibility: Steel structures offer greater design flexibility compared to other construction materials. Steel can be easily shaped and customized, allowing architects and engineers to create innovative and aesthetically pleasing designs.
3. Speed of Construction: Steel structures can be prefabricated off-site, which significantly reduces the construction time on-site. This leads to faster project completion and reduced labor costs.
4. Cost-Effective: While the initial cost of steel may be higher than other materials, its long-term benefits make it cost-effective. Steel structures require minimal maintenance, have a longer lifespan, and can be easily modified or expanded if needed.
5. Fire Resistance: Contrary to popular belief, steel structures are highly fire-resistant. Steel does not burn or contribute to the spread of fire, making it a safe choice for high-rise buildings.



Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital 1

Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital 2


Main structure of the workshop/plant/factory

(Steel tube truss system)we adopt hot-dip galvanizing C section or steel tube truss beam to reduce self-weight of design load and dosage of the steel. At the same time, hot-dip galvanized can widely improve anti-corrosion of the steel. (The construction cycle of the steel structure work is short, which reduces the cost of the project effectively. The steel structure has strong shock resistance and can improve the comprehensive anti-seismic property of the whole house).


Why choose steel structure buildings?

1. Cost Savings
Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control
Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection
All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility
Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency
Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.
How to build a steel building with KXD?
Each of KXD's steel building is custom-made to meet the needs of our customers with high performance, efficiency and international quality standards.
Factors affecting the price of steel structure building:
1. Steel raw material price
Fluctuations of steel raw material price have impact on the price of steel structure building. The big change in steel price will directly cause the overall price of steel structure building to change.
2. Load
Load includes wind load, snow load, dead load, and live load. The engineers calculate the steel structure Qty. based on the load. Large load, more steel structure will be used.
3. The span of the steel frame
Usually, the span of steel frame will controlled in 36m. The larger of the span, the greater the amount of steel structure per square meter. If the steel frame has a large span and no center pillar, the amount of steel used will increase.
4. Structure
If the building has glass curtain wall, crane or mezzanine floor, canopy, etc., to ensure the safe, steel structure will be increased.
If you are looking for a competitive price and good quality steel buildings manufacturer, please contact KXD for our advice.

Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital 3

Deliver goods

The packing method for main steel frame use steel pallet, this method packing can better protect the steel frame, and aslo the loading and unloading will be fast and convenient since it could be taken as a whole.(see attached photo). The best advantage can save the quantity of shipping container, so it will save the cost of ocean freight, save unloading time and cost.

Prefab Prefabricated Industrial Metal Materials High-rise Building Steel Structure Hotel/School/Hospital 4