Product Details
Place of Origin: China
Brand Name: KXD
Certification: SGS / ISO/ BV
Model Number: KXD-S0842
Payment & Shipping Terms
Minimum Order Quantity: 200 Square Meters
Price: US$45.00-70.00
Packaging Details: Seaworthy Package
Delivery Time: 1-2 Months
Payment Terms: L/C,T/T
Supply Ability: 5000 Ton/Month
Day Light Panel: |
High Quality Type |
Origin: |
China |
Installation: |
Techinical Guide Or Turnkey Projects |
Structural Frame: |
Steel Column, Steel Beam, Steel Truss |
Trademark: |
KXD |
Connection: |
High Strength Bolts |
Decoration: |
Custom Available |
Transport Package: |
Seaworthy Package |
Colors: |
Custom As Demands |
Bolts: |
Galvanized, Dacromat, Geomet |
Day Light Panel: |
High Quality Type |
Origin: |
China |
Installation: |
Techinical Guide Or Turnkey Projects |
Structural Frame: |
Steel Column, Steel Beam, Steel Truss |
Trademark: |
KXD |
Connection: |
High Strength Bolts |
Decoration: |
Custom Available |
Transport Package: |
Seaworthy Package |
Colors: |
Custom As Demands |
Bolts: |
Galvanized, Dacromat, Geomet |
Product introduction
Product Description
Steel structure industrial plants, with steel as the main load-bearing structure, are widely used in industrial production, storage and other scenarios. Their spatial layout emphasizes large spans and openness. Steel columns and steel beams form the framework, and the roof and walls are combined with color steel plates, light strips, etc., to achieve the functions of wind protection and natural lighting.
Such buildings are suitable for industrial processing, logistics storage and other industrial demands. With the characteristics of industrialized construction, they have become a typical architectural form of modern industrial parks, helping enterprises quickly build production and operation spaces and promoting efficient industrial production.
Construction Process
1.Preparation Phase: Complete site survey, refine design drawings, determine steel component specifications and foundation parameters; simultaneously obtain construction permits, prepare materials such as steel, bolts, and color steel plates, and dispatch cranes and welding machines to enter the site.
2.Foundation Construction
3.Steel Structure Installation: First, hoist the steel columns, correct their verticality, and then fix them; then, install steel beams one by one, connect them with high-strength bolts to form a portal frame structure;
4.Maintenance System Construction: Lay color steel plates on the roof and install light-shielding strips, ensure waterproof sealing; install color steel plates and rock wool sandwich panels (optional) on the walls, reserve window and door openings, complete the building enclosure, and achieve the shading function.
5.Closing and Commissioning
Construction Advantages
1.Efficient Construction Time
2.Flexible Space
3.Environmentally Friendly and Economical
4.Durable Structure
5.Excellent Seismic Resistance
Factory Profile
Steel Structure Production Process
Steel Component Processing Equipment
Transportation Packaging
Packaging And Logistics
Our Services
FAQ
Q:Can you provide product catalog and quotation?
A: It is better if you can provide drawings(PDF or CAD),we will give you complete your drawings offer. or
We can design as the request from you, then proposal.
Q:What is your packing?
A:Standard export package for container transportation by sea and can be packed as customer's requested.
Q:How long is the delivery time?
A:According to project situation, usually within 30 days after receiving deposit.
Q: Do you offer guide installation service?
A: yes, we can. we can send engineer to your project site for guide installation or arrange the installation team to help erecting the building if necessary. .
Q: are you factory or trading company?
A: We are manufacture factory. And you are welcomed to visit us at any time.
The quality control flow and sales team will show you our professionalism.
Also you will can get best and most competitive price after visiting us.
More details you want, feel free to contact me!