Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Steel Structure Building
Created with Pixso. Prefabricated Steel Building with 50 Years Lifespan Corrosion Resistant and Automatic Ventilation System

Prefabricated Steel Building with 50 Years Lifespan Corrosion Resistant and Automatic Ventilation System

Brand Name: KXD
Model Number: KXD-EQUIPMENT
MOQ: 500 square meters
Price: 20-80 USD per sqm
Delivery Time: 15-35days
Payment Terms: T/T
Detail Information
Place of Origin:
shandong qingdao
Certification:
CE, ISO 9001, ISO140001, ISO45001
Ventilation System:
Automatic Ventilation System
Lifespan:
50 Years
Privacy:
Limited
Main Steel Frame:
H Steel,Z Or C Purlin
Surface:
Hot-dip Galvanized / Painted
Main Steel:
H Steel, C, Z Purlin
Wall Color:
White, Blue, Optional Colors
Design Parameter:
Wind Load,Snow Load And Earthquake
Structuretype:
Frame Structure
Roof Slope:
15°
Model No:
KXD-SSW181
Product Resistance:
Corrosion Resistant
Processing Service:
Bending, Welding, Decoiling, Cutting
Main Structure:
Galvanized Light Steel Frames
Purlin:
C.Z Shape Steel Channel
Durability:
Long Service Life, Resistant To Weather And Corrosion
Packaging Details:
Steel Pallet Or In Bulk
Supply Ability:
3000 Sets/Month
Product Description
Prefabricated Structural Steel Building Material Greenhouse KXD202301
Product Overview

KXD Steel Structure specializes in providing comprehensive steel construction solutions, offering professional services in design, manufacturing, and installation. Our team brings extensive experience working with diverse construction types, ensuring all projects meet customer specifications and quality standards.

We are committed to delivering the highest quality products at competitive prices, backed by exceptional service. Our continuous innovation and dedication to excellence have established us as a trusted partner in the global construction industry.

Steel structure greenhouse design overview Greenhouse structural framework detail Steel building interior view Completed greenhouse installation
Quality Inspection & Specifications
Component Specifications
Main Components Base, Main Frame, Material, Purlin, Bracing, Bolt, Roof & Wall, Door, Window, Surface
Applications
  • Workshop/Warehouse/Factory
  • Storage/Garage/Shed/Hanger
  • Animal Farm (specific animal type confirmation required)
  • Steel Building, Modular House
  • Steel H-column and Steel H-beam Structure
  • High-rise Building Projects (tank towers, etc.)
  • Other Steel Structure Building Materials
Packing Main steel frame without packing loaded in 40' OT; Steel pallet packing loaded in 20/40GP, HQ
Drawing Software AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and others
Design Parameters

For accurate quotation, please provide the following information:

  • Project Location (Country/Area)
  • Size (Length × Width × Height in cm)
  • Snow Load (Maximum snow thickness)
  • Wind Load (Maximum wind speed in Kn/m², km/h, or m/s)
  • Seismic Magnitude
  • Middle Column Allowed (Yes/No)
  • Brickwall Allowed (Yes/No with thickness in cm)
  • Door & Window Quantity & Size
  • Crane Requirements (Allowed/Not, Tonnage if applicable)
Warehouse project example Steel structure warehouse interior
Steel Building Packaging

Our main steel frames are packaged using steel pallets, providing superior protection during transportation. This method ensures fast and convenient loading and unloading operations, as the entire package can be handled as a single unit. The primary advantage is significant savings in shipping container quantity, resulting in reduced ocean freight costs and faster unloading times.

Steel pallet packaging method Packaged steel frame ready for shipping
Installation Services

We offer flexible installation support based on customer requirements:

  • Technical engineers to guide local installation teams
  • Small installation teams working alongside local workers
  • Comprehensive installation services with our full workforce
  • Training programs for local workers

Service selection depends on project scope and economic feasibility.

Installation team at work Steel structure assembly process Framework installation detail Completed structure exterior Final installation quality check