| Brand Name: | KXD-SSW1059 |
| Model Number: | KXD-SSW1059 |
| MOQ: | 200 Square Meters (MOQ) |
| Price: | US$50.00-100.00 |
| Delivery Time: | 30days |
| Payment Terms: | T/T |
Steel structure buildings are increasingly the preferred choice for commercial buildings, study centers, education facilities, sports and culture houses, workshops, warehouses, poultry houses, and more.
You may ask: what are the advantages of a pre-engineered steel or metal structure building, and why choose steel for your building project? Statistics show that steel buildings have become a trendy and reliable construction solution for commercial, industrial, and residential applications. Compared with traditional reinforced concrete (R.C.C.) buildings, pre-engineered steel structure buildings are 30% more cost-saving, require 60% less construction time, are 40% lighter in weight, and retain nearly 80% resale value — all while meeting the customer's construction requirements.
Prefab structures for industrial and commercial functions are steel structures built on a structural concept of primary members, secondary members, and roof and wall sheeting, connected to each other and to various other building components. These buildings can be provided with different structural and non-structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors and windows, trusses, mezzanine floors, fascias, canopies, crane systems, and insulation, based on the customer's requirements. All steel buildings are custom designed to be lighter in weight and high in strength. Steel building designs have become more flexible, durable, and adaptable over the last four decades, making steel one of the preferred materials for building construction.
PMB/PEB systems are ideal for non-residential and wide-span low-rise buildings. Key advantages include economical cost, factory-controlled quality, durability, longevity, flexibility in expansion, environmental friendliness, and faster installation.
Pre-engineered metal buildings are used for diverse applications such as factories, warehouses, showrooms, supermarkets, aircraft hangars, metro stations, offices, shopping malls, schools, hospitals, community buildings, and many more.
As a leading PMB/PEB manufacturer, KXD provides the complete service of engineering, fabrication, and erection, ensuring better quality control at every stage of the process.
Primary members are the main load-carrying and support members of a pre-engineered building. The main frame members include columns, rafters, and other supporting members. The shape and size of these members vary based on the application and requirements. The frame is erected by bolting the end plates of connecting sections together. All steel sections and welded plate members are designed in accordance with the applicable sections of the latest international codes and standards, such as GB and IS, to meet all customer specifications.
| Frame Type | Span Range |
|---|---|
| Lean To (L-TO) | 3 m to 18 m |
| Space Saver (SV) | 6 m to 18 m |
| L Canopy (L-CAN) | 3 m to 6 m |
| Butterfly Canopy (T-CAN) | 6 m to 12 m |
| Single Slope | 6 m to 18 m |
| Rigid Frame (RF) | 6 m to 96 m |
| Beam & Column (BC-1) | 24 m to 48 m |
| Beam & Column (BC-2) | 36 m to 72 m |
| Beam & Column (BC-3) | 48 m to 96 m |
| Multi Span (MS) | 24 m to 120 m |
Crane beams are support members for different types of cranes and allow for unobstructed movement of cranes along the building length. These crane beams are supported on the columns of a building.
The standard mezzanine system consists of profiled steel deck, mezzanine joists, built-up beams, and intermediate support columns. Built-up beams span in lateral directions and mezzanine joists in longitudinal directions, bolted to the top flange of the beams. A concrete slab is cast on the steel deck as a finished surface. Steel checkered plates can also be used as the top surface.
The KXD Truss System is one of the company's most popular and highly economical products. It is a rigid structure ideal for large-span roof systems, multiple-bay buildings, and mezzanine floor framing. These structures are individually designed to meet the specific requirements of each building and are fabricated utilizing high-quality, efficient fixtures. The system allows for easy erection, as all connections are field-bolted except for field splices on very large spans — no site welding is required.
There is the possibility of significant reduction in clearances and building heights by running service pipes and ducts through the trusses. Foundation costs are also reduced due to fewer columns being required to support larger spans.
KXD provides various types of fascias specially designed to meet customer requirements. These can be vertical, horizontal, or with curved sheeting to enhance the architectural look of the building. Wall canopies at eaves, end walls, over doors, and over windows are also provided based on requirements.
Secondary structural framing refers to purlins, girts, eave struts, wind bracing, flange bracing, base angles, clips, and other miscellaneous structural parts. Purlins, girts, and eave struts are cold-formed steel members with a minimum yield strength of 345 MPa (50,000 psi) and conform to the physical specifications of GB/ISO/CE or equivalent.
Purlins and girts are roll-formed Z sections, 200 mm deep with 64 mm flanges, and have a 16 mm stiffening lip formed at 45° to the flange. They are supported on columns, rafters, or building walls. They can be lapped and nested at the supports, creating a continuous beam configuration. They are placed on the roof and perimeter of the building, serving as support for roof sheeting and wall cladding.
C-Sections are 200 mm deep with a 100 mm flange. The flanges are perpendicular to the web and have a 24 mm stiffening lip.
Eave struts are 200 mm deep with a 104 mm wide top flange and a 118 mm wide bottom flange, both formed parallel to the roof slope. Each flange has a 24 mm stiffener lip. These are located along the sidewall at the intersection of the planes of the roof and wall. Constructed from cold-formed C-Section and rolled to suit the roof slope, this member transmits longitudinal wind force on the end walls from roof brace rods to wall brace rods.
These are long-span load-carrying trusses suitable for direct support of floors and roof decks in buildings. The system consists of crimped angles welded to the top and bottom chords.
Cable bracing is made of extra-high-strength seven-strand cable and can be designed to accommodate any length to ensure the stability of the building against forces in the longitudinal and lateral directions due to wind, cranes, and earthquakes. It is made of a cable forged into a rod terminal, and this arrangement is then fixed to a structure using a hill-side washer, nut washer, and nut.
KXD standard steel panels are 0.3, 0.4, 0.5, or 0.6 mm thick and have a minimum yield strength of 345 MPa. Steel panels are hot-dipped and galvanized with zinc or zinc-aluminium coating. Galvanized materials conform to GB for 275 grams per square meter.
KXD panels are prepared with a multilayered coating system to ensure long life and optimum coating adherence. The base material is pretreated before applying a corrosion-resistant primer and top coat. The combined thickness of the painted film is 25 microns on the front side and 12 microns on the reverse side.
The KXD Roof profile is strong and cost-effective and was developed specifically for roofing applications. The bearing leg design permits easier installation and maintenance, supports thicker layers of insulation, and allows easier curvature for a visually appealing finish.
KXD Wall is a cost-effective, partially concealed fastener panel with a sculptured valley shape between the major ribs for a superior architectural look for external walls.
KXD Deck Panels are used in high-rise buildings, office buildings, and mezzanine floors in industrial buildings and warehouses. These decks can be used as permanent shuttering to support wet concrete and help create composite slabs and floor beams. The continuous flange stiffeners and deep embossments increase load-carrying capacities. They provide a stable and rigid working platform without any need for propping. These panels are roll-formed from hot-dip galvanized coils of 345 MPa with thickness starting from 0.6 mm to 1.2 mm.
Arctic White, Caribbean Blue, Desert Beige, Sun Gold, Autumn Green, Galvalume/AluZinc.
The main purpose of insulating a building is to reduce the heat transfer coming through the ceilings and openings.
This is a panel manufactured by the press-injection method to produce a polyurethane core between exterior steel facings. It can be used on the roof and wall as cladding.
This can be used on the roof or wall and can be retrofitted on existing buildings. The fiber glass insulation is fire-safe and CFC-free and does not emit toxic smoke. It is laminated to the top and bottom steel facings with special chemical glue, completely filling the insulation cavity.
KXD Roof Insulated Panels (KRIP) is one of the premier roofing systems, using the KXD Roof (KR) profile for a durable, low-maintenance, and weather-tight roofing system. The large panel size reduces the number of joints, and the high-corrugation overlap joint reduces water leakage.
KXD Wall Insulated Panels (KWIP) uses the KXD Wall (KW) cladding profile for a speedy and cost-efficient solution for external walls where higher insulation performance is required. This profile is most suitable to overshadow the fasteners. It can be applied as external walls for commercial and industrial applications.
For any new potential metal building buyer, KXD's turnkey solution pack makes your project feel just like a local market purchase experience — with so much ease. You simply fill out the questionnaire form, and KXD handles the rest.
Installation is a major concern for many steel structure and metal building buyers. KXD's professional installation team takes the burden off our clients, as KXD is able to send installation members to the local construction site to help build the steel structure building. Our record of successful cases has proven the success of this model.
Imagine heading to a local supermarket with a purchase list — you go straight to the sections you know, and a helpful salesperson guides you if needed. Building a metal building with KXD works the same way: fill out the questionnaire with assistance from an assigned metal building specialist, and KXD takes care of the rest.
KXD will work out a preliminary design and quote for your approval, then roll out the construction and engineering drawings for local authority approval. Once approved, our company produces the shop drawings for the manufacturing process and sends installation drawings to our clients for ease of installation.
KXD maintains a strict quality control procedure. Workers must conform to manufacturing requirements, and quality inspectors perform inspections at intervals of approximately 15 minutes to avoid potential manufacturing flaws. For certain projects, we pre-assemble the members to ensure smooth on-site installation.
After manufacturing, KXD's loading team loads the members into shipping containers using the steel pallet loading method. KXD's installation squad can travel to the local construction site to guide installation alongside local workers — a model proven by our completed cases.
The primary structural elements of a multi-storey steel building — namely the columns and floor beams — should be laid out with a view to minimizing both the cost of the steelwork and the time required for erection. For any given structure, a layout can be determined that optimizes the combined beam and column content, but in most cases functional and architectural considerations must be taken into account, which works against the design of optimal bay sizes. Consultation between the architect and the engineer in the early stages of planning can help prevent an uneconomical layout from being adopted.
The third structural element, after the columns and beams, is the stabilizing system necessary to provide lateral support to the building — to supply stability under gravity loading and to resist the overturning effects of wind. The taller the building, the more important the bracing system becomes; in very tall structures, providing adequate lateral support becomes the dominant consideration.
Lateral stability may be provided within the steel structure itself by means of bracing, moment-resisting beam-column connections, or steel shear walls, or it may be imparted by other building elements such as reinforced concrete service towers or concrete or brick infill panels in the walls. In all cases, the stabilizing elements may be located within the plan dimensions of the building, in the perimeter walls, or even external to the building.
If a building is to incorporate the stabilizing system within the steel structure, the framework can be of the two-way braced, one-way braced and one-way rigid, or two-way rigid type. Triangulated bracing is usually cheaper than a stiff moment-resisting frame and should be used wherever access problems do not arise — that is, where door, window, or service openings are not required.
In addition to vertical bracing systems, it is necessary to provide stiffness within the plane of each floor, both to maintain the squareness of the floor in plan and to transmit the wind loading on the exterior of the building to the vertical bracing.
Various bracing systems can be employed to provide stability to multi-storey buildings. The vertical steel bracing is often shown as the X-type for simplicity but could equally be chevron bracing, knee bracing, or some other type. Floors may be steel-braced, but in practice the bracing function could be furnished by the concrete floor slab, in which case only nominal squaring-up steel bracing would be required. These systems are applicable to buildings of almost any number of storeys.
The two-way steel braced system is one of the most efficient in terms of stiffness, speed of erection, and economy. All beam-to-column connections are of the simple (hinged) type, so labor input in both columns and beams is minimized and erection can proceed quickly. Being fully steel-framed, the structure is self-supporting and can be completely erected without having to be integrated with other trades. The only drawback is the presence of braced panels in the exterior walls, which might interfere with the window pattern — but with the current trend toward exposed steelwork, windows could be set back and the bracing expressed boldly as an architectural feature. In very long buildings, one or more interior sets of bracing would be necessary.
A stiff frame in the end elevation is another method of providing transverse stiffness to the structure. All transverse frames — not only the end ones — would be stiff, but the building would still rely for longitudinal stiffness on two sets of one-way bracing in the sides. This is a more costly arrangement than the two-way braced solution but removes the drawbacks of triangulated bracing. It is more suited to long buildings and has the further advantage that the main (transverse) floor beams could be shallower because of their continuity, with a consequent reduction in storey height. On purely economic grounds, however, triangulated bracing is far more cost-effective than a moment frame, both in shop fabrication and in erection.
Where a building is fairly compact in plan and does not have a great length-to-width ratio, a central service core is a very efficient means of providing stability.
In steel-framed buildings, the floor framing system almost invariably consists of a series of main and secondary beams at right angles to each other in plan, with the secondary beams framing into or passing over the tops of the main beams. The floor slab or deck is then carried on top of the secondary beams.
Except where stiff-frame action is required, the main beams are usually simply-supported spans between the columns. If the secondary beams have their top flanges flush with the tops of the main beams, they would be framed into the webs of the main beams and would thus also be simply-supported; this produces a floor grid of minimum depth and results in a reduction in storey height. However, underfloor services running at right angles to the main beams would then have to pass through holes formed in the webs of these beams, or else be routed below the main beams, which would increase the floor depth.
If the secondary beams pass over the tops of the main beams, however, they would no longer be simply-supported but continuous, significantly reducing mass and especially deflection. The routing of services in both rectangular directions in plan would be facilitated by the space available above the main beams.
The two beam framing systems referred to above represent conventional practice as used on the great majority of small to medium-sized buildings. The beams are of straightforward construction and employ standard end connections, making them easy and cheap to fabricate. A number of non-standard options are available and are worth considering for larger buildings where a high level of repetition of components would justify their use.
Main beams span between columns and therefore cannot normally be made continuous. Continuity can, however, be achieved by replacing the beam with a pair of closely-spaced twin beams passing on each side of the column. Because of their continuity, the main beams can now be designed plastically, for a combined moment on the two beams of 70 percent or less of that for the simply-supported single beam, and at a combined mass about equal to that of the single beam. As regards deflection, the twin-beam system tends to be stiffer than a single simply-supported beam of the same load capacity because of the continuity. The labor input for twin beams is greater, but this alternative is useful when it is desired to reduce the depth of the floor (and thus the storey height), or on long spans where twin rolled I-sections replace a more expensive single welded plate girder.
Having discussed the structural side of a multi-storey steel building, we now turn to wall and roof cladding and interior and exterior wall finish and decoration options.
For panels, we offer our latest foam panel and fiber cement panel. Gypsum board is a good option for partition walls. For ceilings, gypsum, PVC, or integrated ceiling systems are all suitable. All these panel options are open to further decorative finish options.
Our final consideration is the EIFS (External Insulation Finishing System). Our recommendation is the integrated insulated decoration panel, which offers perfect thermal insulation performance with a variety of pattern and color choices.
| Faster installation | Single source responsibility |
| Lower cost | Flexibility in expansion |
| Large clear spans | Quality control |
| Low maintenance | Energy-efficient roof and wall systems |
| Architectural versatility | Optimized design of steel reducing weight |
| Quick delivery and quick turn-key construction | Water-tight roofs and wall coverings |
| Pre-painted and low maintenance requirement | Building can be dismantled and relocated easily |
| Clear spans up to 100 m without internal columns | Flexibility in building dimensions |
| Fixed deadlines and costs | Weather-tight roof and wall coverings with accessories for long maintenance-free exteriors |