Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Steel Structure Building
Created with Pixso. High Strength Steel Structure Building with 70 Years Using Life and 300 km/h Wind Load Pre-engineered Steel Building

High Strength Steel Structure Building with 70 Years Using Life and 300 km/h Wind Load Pre-engineered Steel Building

Brand Name: KXD-SSW1059
Model Number: KXD-SSW1059
MOQ: 200 Square Meters (MOQ)
Price: US$50.00-100.00
Delivery Time: 30days
Payment Terms: T/T
Detail Information
Place of Origin:
Place of Origin Qingdao
Certification:
ISO, SGS, CE, BV
Cell Capacity:
8 Hens Per Cell
Packing:
Membrane Package/sea Worth Pakcage
Frame Type:
Steel Frame
Tie Beam:
Round Pipe Or Square Tube
Wind Load:
Up To 300 Km/h
Using Life:
70years
Height:
6m (Per Level)
Steel Grade:
Q235, Q345, Q355
Columns And Beam:
H Section Column&Beam, Latticed Column
File Formats:
Solid Works, Autocad(Dxf, Dwg), Pdf
Window:
Aluminum Alloy Window
Lifespan:
Longer
Column:
Welded H Beam
Installationmethod:
Bolt Connection / Welded Connection
Roof Cladding:
Sandwich Panel Glass Wool
Service Life:
50 Years
Packaging Details:
pallet
Supply Ability:
5000ton/Month
Highlight:

High Strength Steel Structure Building

,

70 Years Using Life Pre-engineered Steel Building

,

300 km/h Wind Load Steel Structure Building

Product Description
Product Overview
Prefabricated high strength steel structure industrial frame warehouse exterior view
Prefabricated steel structure warehouse interior showing primary and secondary framing members

Pre-engineered steel buildings are steel structures built over a structural concept of primary members, secondary members, roof and wall sheeting connected to each other and various other building components.

These buildings can be provided with different structural and non-structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors & windows, trusses, mezzanine floors, fascias, canopies, crane systems, insulation and more, based on the customer's requirements. All steel buildings are custom designed to be lighter in weight and high in strength.

Applications of Pre-Engineered Steel Buildings

Pre-engineered buildings (PEBs) are the most flexible solution for contractors and owners. With the advantages of low cost, high durability, perfect quality control and fast erection, PEBs are used across a wide range of applications including factories, warehouses, logistics centers, showrooms, shopping malls, schools, hospitals and community buildings.

Industrial
  • Factories
  • Workshops
  • Warehouses
  • Cold Storages
  • Steel Mills
  • Assembly Plants
Commercial
  • Showrooms
  • Supermarkets
  • Offices
  • Shopping Centers
  • Exhibition Halls
  • Restaurants
  • Logistics Centers
  • Multi-purpose Buildings
Public
  • Schools
  • Hospitals
  • Conference Halls
  • Laboratories
  • Museums
  • Stadiums
Others
  • Farms
  • Utility Shelters
  • Pump Stations
  • Aircraft Hangars
  • Airport Terminals
Why Choose Pre-Engineered Steel Buildings
1. Cost Savings

Price per square meter can be 25%–30% lower than conventional steel buildings. Site erection cost is low because of faster erection times and an easier erection process.

2. Quick Erection

All steel components are fabricated at the factory and linked by bolts at the site. The erection process is fast, step by step, easy to install and requires simple equipment. Construction time is reduced by 60% compared with traditional R.C.C. (reinforced concrete) buildings.

3. Flexibility

Pre-engineered steel buildings are flexible in any design requirement, easy to expand in the future, and economical with low transportation costs.

4. Energy Efficiency

Today's pre-engineered buildings are the green solution for the environment, offering CO2 reduction, energy efficiency and recyclability.

Components of a Pre-Engineered Steel Building

A pre-engineered metal building consists of the following components:

  • Primary Members / Main Frames
  • Secondary Members / Cold Formed Members
  • Roof & Wall Panels
  • Accessories, Buyouts, Crane System, Mezzanine System, Insulation, etc.
  • Sandwich Panels
Primary Members / Main Frames

Primary members are the main load-carrying and support members of a pre-engineered building. The main frame members include columns, rafters and other supporting members. The shape and size of these members vary based on the application and requirements.

Secondary Members / Cold Formed Members

Secondary structural framing refers to purlins, girts, eave struts, wind bracing, flange bracing, base angles, clips and other miscellaneous structural parts. Purlins, girts and eave struts are cold-formed steel members with a minimum yield strength of 345 MPa (50,000 psi) and conform to the physical specifications of GB/ISO/CE or equivalent.

Roof & Wall Sheets / Panels

Standard steel panels are 0.3 mm, 0.4 mm, 0.5 mm or 0.6 mm thick and have a minimum yield strength of 345 MPa. Steel panels are hot-dipped and galvanized with zinc or zinc-aluminium coating. The base material is pretreated before applying a corrosion-resistant primer and top coat. The combined thickness of the painted film is 25 microns on the front side and 12 microns on the reverse side.

Other Building Accessories

Other building accessories include anchor bolts, fasteners (bolts, nuts, turnbuckles, expansion bolts), gutters, downspouts, doors, windows, ventilators, skylight panels, louvers and all other building-related materials.

Manufacturing Program & Method Statement

The purpose of this method statement is to describe the guidelines and methodology followed by our company during the fabrication, blasting, painting and supply of pre-engineered structures for any steel building project.

A. Material Receiving Procedure
  • Verify the receiving documents and quantity of the received material by stores.
  • Submit the load for QC inspection by stores.
  • As a first inspection, QC performs a visual inspection to confirm the surface condition and check for any damage, including the condition of packing and wrapping.
  • QC performs the dimensional inspection if the material is accepted in visual inspection; the material will be returned to the supplier if rejected.
  • In the dimensional inspection, QC checks all-over dimensions such as length, width, depth and thickness.
  • Once the material is accepted in dimensional inspection, supporting documents such as the MTC are verified by QC to ensure that the heat number in the material matches the heat number in the received material.
  • QC prepares the Incoming Material Inspection Report as per the inspections carried out above.
B. Preparation of Material

The Design and Development department prepares the structural drawings for the project. As per the drawings, the production department prepares the items. Preparation is divided into two stages.

Preparation of Plates
  • The drawings are transferred to a storage device using expert software.
  • These drawings are copied into the plate processing machine.
  • According to the drawings, the preparation of the items is carried out.
  • The automated machine senses the length of the plate and carries out plate processing according to the fed NC files in the expert software. Punching of the part mark on the plate is done first.
  • Drilling of the plates is done as per the NC files in the machine.
  • Plasma cutting of the plates is done finally.
Preparation of Beams / Tubes, etc.
  • The fabrication drawings are prepared by the design department and fed into the automated cutting and drilling machine.
  • The automated machine performs drilling wherever required as mentioned in the drawings.
  • After completing the cutting and drilling process, the job is transferred from the drilling machine to the fit-up section.
C. Fit-Up
  • The fabrication drawings are issued by the production engineer to the production supervisor for execution in priority order.
  • These drawings are given to the fabricators for fit-up of the job.
  • The prepared beams and other connection detail items are collected by the fabricators for fit-up of the job.
  • Other items such as end plates, gusset plates, stiffeners, purlin cleats and stay angle cleats are fixed in the appropriate places mentioned in the fabrication drawing by tack welding.
  • Once the fit-up of the job is complete, the production department offers it to the QC department for inspection.
D. Welding & Grinding
Procedure — Submerged Arc Welding
  • The production supervisor plans the jobs to be welded.
  • Only items that are fitted and accepted by QC are taken for welding.
  • Clean the location where welding is to be done, free of dust, oil, grease, etc.
  • Set the wire feed and voltage for welding.
  • The fillet size shall not exceed the smaller thickness of the part unless otherwise specified in the drawing.
  • Fillet size parameters are maintained according to the chart displayed in the welding area, prepared based on the GB50661-2011 standard.
  • After welding, remove spatters and slag completely.
  • Grind off burrs, sharp edges and excessive reinforcement.
  • Offer to QC for inspection.
Procedure — MIG Welding
  • The production supervisor plans the jobs to be welded.
  • Only items that are fitted and accepted by QC are taken for welding.
  • Clean the location where welding is to be done, free of dust, oil, grease, etc.
  • Set the wire feed and voltage for welding.
  • The fillet size shall not exceed the smaller thickness of the part unless otherwise specified in the drawing.
  • Fillet size parameters are maintained according to the chart displayed in the welding area, prepared based on the GB50661-2011 standard.
  • After welding, remove spatters and slag completely.
  • Grind off burrs, sharp edges and excessive reinforcement.
  • Offer to QC for inspection.
E. Blasting
Handling & Preparation of Material Prior to Blasting
  • Prior to any work commencing, a Tool Box Talk is performed by the Foreman for every task involved in the automated and manual blasting phase. The working area is barricaded with information notices posted to alert passersby of the operation within.
  • The ID of fabricated steel to be blasted is recorded by the Foreman on a shift-to-shift basis for traceability purposes.
  • Raw material steel sections to be blasted are craned onto the "in-feed" rack. The "in-feed" rack is custom built and level with the rollers of the conveyor. All rigging is planned before the lift of items. All personnel involved are suitably trained and qualified for the job they are doing.
  • Once the raw material is on the "in-feed" rack, it may be cleaned with high-pressure air to remove dust from the surface of the item.
Loading the In-Feed Conveyor

Once cleaned, the material is fed into the chamber of the automated machine through the conveyor. The chamber consists of both inlet and outlet vestibules, on which rubber curtains are hung to prevent the escape of abrasives during the blasting process.

Automated Blasting of Raw Material
  • The operator of the machine is trained in its use. During the commissioning phase, the vendor trains the selected personnel in the safe use and maintenance of the machine. These individuals alone are allowed to run the machine's control panel.
  • In the central blast chamber, six internally mounted wheels rotate at high speed, throwing the steel shot working mixture at high velocity directly onto the steel substrate — the actual blasting activity. As the structural beams move slowly through the chamber, they emerge through the exit vestibule fully cleaned (Grade SA 2/2.5). Operatives do not handle or touch the beams during the blasting process. Once fully exited, the beams are manually rolled back off the conveyor onto an "out-feed" rack, ready for priming.
  • All personnel working with the automated blasting machine wear full PPE in addition to ear protection when in the immediate vicinity of the machine. Signage is posted at the machine reminding personnel to comply with these requirements.
F. Painting of Fabricated Material

Application of paint is normally done once per day in the afternoon, once the day's scheduled blasting work is complete. Prior to the application of the primer, QC inspects the blasted surfaces to check that the required standards in the approved ITP have been met. Any area deemed to have fallen short of the required standard requires re-blasting, either by being driven through the blast chamber again or by injection blast gun if possible, while still on the out-feed rack. Any "sweep" blast done by mini pot utilizes copper slag as the abrasive.

Once the blasted surface has been accepted by QC, application of the primer can commence, provided ambient condition checks prove satisfactory. These must be checked and recorded before any and every application. For coatings to proceed, the surface must be at least 3°C above the dew point temperature, and the relative humidity must be 85% or below. The surface must be dry and free from oil, grease and soluble salts, protrusions, sharp edges or visible laminations, and must not exceed 40°C in temperature.

Application

Before application, QC inspects the atmospheric conditions according to GB50205-2001:

  • Air Temperature: 5–40°C
  • Substrate Temperature: 23–40°C
  • Relative Humidity: 50–85%

Paint is applied wherever possible by means of airless spray. The paint material is checked for conformity with shelf-life restrictions, temperature and batch number. Mixing ratio, tip size and method of agitation are checked by QC to ensure adherence with the approved ITP and paint manufacturer's recommendations. Pot life is also monitored once mixed. Only experienced spray applicators are used for the application of paint materials, and all wear appropriate PPE for the job.

During application, the spray applicator takes WFT (Wet Film Thickness) readings in accordance with the approved ITP to ensure the target WFT is being achieved. Spot checks by QC verify conformity.

Specification of Painting System:

Primer coat: per the project requirement
Second coat: per the project requirement
Third coat: per the project requirement
Touch-up at site: after erection

G. Loading and Shipping
  • Receive the finished components from production (Painting department) and store them properly, job-wise, in the yard.
  • Arrange trucks from contract-signed truck companies immediately after receiving clearance of the job for loading.
  • Loading can start once all details are confirmed.
  • Copies of all documents are kept in the job file.
Quality Standard & Control

With a 20-year warranty in the steel building industry, our company sets a high standard for the quality of steel buildings. We have acquired the ISO9001 and CE certificates. The following are the related standards that we strictly follow for the design and fabrication of steel buildings:

  • GB/T1591-2008/2018
  • GB/T11263-2010
  • GB/T 2518-2008
  • GB/T12754-2006
  • GB/T 1228-2006
Example: Process, Fabrication and Quality Control Standard for Fillet Weld Size
1. Purpose

To ensure the quality of fillet welds, meet the technical requirements of welded members and improve the standardization of our fabrication, this regulation has been specially formulated.

2. Application Scope

This manual applies to the design, fabrication and inspection of fillet weld size.

3. Fillet Weld Leg Size

3.1 Definition of fillet weld leg size (K): The length of the catheti from the maximum isosceles triangle drawn from the section of the fillet welding seam. For the fillet weld leg size without groove, see Illustration 1; for the fillet weld leg size with PJP or CJP groove, see Illustration 2 (take CJP for example).

3.2 Fillet weld leg size requirements:

  • 3.2.1 All fillet weld sizes should not be less than the drawing and design values.
  • 3.2.2 Minimum fillet weld size K ≥ 1.5×√t, where t is the thickness of the thicker welding member (the thickness of the thinner welding member may be adopted when welded by low-hydrogen alkaline electrode). The minimum fillet weld size may be reduced by 1 mm when submerged arc welding is adopted. The fillet weld size should be increased by 1 mm when applying to the single-side fillet weld of a T-section. When the thickness t ≤ 4 mm, the minimum fillet weld size should be the same as the member thickness.
  • 3.2.3 Maximum fillet weld size K ≤ 1.2t, where t is the thickness of the thinner welding member (except the steel tube structure).
  • 3.2.4 When the fillet weld is on the edge of welding members (t), the fillet weld size cannot exceed the edge of the welding member, and the maximum weld size is as follows: (1) when t ≤ 6 mm, K ≤ t; (2) when t > 6 mm, K ≤ t − (1~2) mm.
  • 3.2.5 For fillet weld size in circular holes or trench holes, K ≤ (1/3)d, where d is the diameter of the circular hole or the short diameter of the trench hole.
  • 3.2.6 For the fillet weld size without groove, it should not be more than 17 mm. If it has to be more than 17 mm due to load considerations, out of economic factors it should be changed to CJP or PJP fillet welding.
  • 3.2.7 For fillet welds that require CJP: K ≥ t/4, see photos 3(a)(b)(c). For the fillet weld size between the web plate and top flange plate of some important members (e.g., if there is a fatigue design requirement), crane beams or similar members, it may be t/2 and must not be more than 10 mm at the same time.
4. Selection of Fillet Weld Size

Based on the standard, our experience and actual process, the requirements on fillet weld size are as follows (in terms of when there is no request on the drawing but there is an inspection request):

Form of Fillet Weld Leg K (Fillet Weld Size) Value Note
Fillet weld without groove K = (0.7~1)t and ≤ 15 mm For most steel structure buildings
Fillet weld without groove K = (0.5~0.6)t For strengthening ribs and other secondary members
Fillet weld with groove (CJP and PJP) K = t/4 and K ≤ 10 mm For most steel structure buildings
Fillet weld with groove (CJP and PJP) K = t/2 and K ≤ 10 mm Important members (crane beams or connection between web plates and flange plates of similar members)

Note: 1) t = thinner weld member thickness. 2) For concave fillet welds, the actual measured value is required to be 1–3 mm higher than the fillet weld foot size specified in the above table (because what is actually measured is not the fillet weld size; it is larger than the fillet weld size). 3) If the fillet weld size is specifically marked on the drawing or technical document, we will strictly follow it.

For secondary members that are free of force and only serve for strengthening, the fillet weld size may refer to the following chart:

Parent Metal Thickness (t) (mm) Minimum Fillet Weld Size (mm)
t ≤ 6 3 (minimum value being 5 for crane beams)
6 5
12 6
t > 20 8
H-Section Manufacturing Equipment & Process

Process flow: Steel plate cutting → H-section assembly → Automatic welding → H-section strengthening → Assembly → Manual welding → Shot blasting → Painting → Storage.

I. Steel Plate Cutting

The H-section steel plate is checked again by the factory and applied only under the condition of meeting design and specified requirements after checking. Steel plate cutting should aim at quality guarantee and material saving. For each process — plate cutting, H-type assembly, component assembly and pre-assembly — precise setting-out is carried out by professional setting-out workers on the processing surface and assembly sample plates. To guarantee the accuracy of the components' geometrical dimensions, tolerance of form and position, angle and contact surface, inspection by an inspector after setting-out is necessary. To ensure cutting quality, the surface of ultra-thick plates is subjected to a surface carburizing hardness test before cutting. CNC cutting equipment is preferred for cutting. High-purity 98.0% acrylic gas and 99.99% liquid oxygen gas are used to guarantee the smoothness and flatness of the cutting surface without notches and slag. The groove is cut by a special imported cutting machine.

Equipment Name Model No. Application Feature
Portable CNC Fire-cutting Machine CNCDG-1530 Steel plate cutting (5–100 mm plate cutting thickness), beveling of the edge. Advantageous as small equipment and easy to move. Mainly for cutting regular and irregular small components and beveling of the plate.
Straight Flame Cutting Machine DZCG-4000A Steel plate cutting (5–100 mm plate cutting thickness), Y flange plate and web plate cutting; effective cutting width: 3200 mm.
CNC Cutting Machine CNC-4000C Steel plate cutting (5–100 mm plate cutting thickness), Y flange plate, web plate and irregular component cutting; effective cutting width: 3200 mm.
Radial Drilling Machine Z3050*16/1 Maximum drilling diameter φ50 mm; mainly for processing of component bolt-connection holes.
Puncher Machine JH21-400 Maximum stamping pressure 400 ton; mainly for plate punching, blanking, bending and shallow stretching.
Shearing Machine Q11Y-25*2500 Cutting width 2500 mm and cutting thickness 3–25 mm.
II. H-Section Steel Assembly

The assembly process is set up on the imported H-section production line. A 4-hydraulic positioning system presses firmly between the upper/lower flange and web plates in position. The parallelism of the flange plates and perpendicularity between flange and web plates are adjusted and then fixed. The fixing welding adopts CO2 gas shielded welding.

Equipment Name Model No. Application Feature
H-Section Steel Assembly Machine Z20B Mainly for H-type assembly; flange width 150–800 mm, web height 160–2000 mm.
III. Automatic Welding

The H-section steel members are hoisted into the gantry-type submerged arc automatic welding machine for welding. The welding process is carried out in accordance with the specified welding sequence and regulation parameters. Preheating, using electrical heaters, is necessary for ultra-thick plates of components. The set temperature is determined based on the specified value. Please see factory welding process documents for details.

Equipment Name Model No. Application Feature
Gantry-type Submerged Arc Automatic Welding Machine LHA5ZB Mainly for assembly welding of H-section steel whose maximum cross section is up to 800 mm × 2000 mm.
IV. H-Section Steel Strengthening Machine

H-section steel strengthening process: correction of flange flatness using the H-section steel flange plate strengthening machine. Flame-correct the perpendicularity between the H-section flange and web plate under special circumstances, then correct the side bending of the H-section steel. The flame temperature should be controlled within the range of 600–800°C.

<table class="pd-table