Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Steel Structure Building
Created with Pixso. Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period

Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period

Brand Name: KXD
Model Number: KXD-SSW1059
MOQ: 200 Square Meters (MOQ)
Price: US$50.00-100.00
Delivery Time: 30days
Payment Terms: T/T
Detail Information
Place of Origin:
Qingdao
Certification:
ISO, SGS, CE, BV
Packaging Details:
pallet
Supply Ability:
5000ton/Month
Product Description
Steel Structure Construction Building for Storage Shed (KXD-SSW1013)
Basic Information
Model NO. KXD-SSW1013
Certification ISO, SGS
Customized Customized
Size According to Customers' Requirement
MOQ 200m²
Quality Control Daily
Life Cycle 50 Years
Production Capacity 5000ton/Month
What is Pre-Engineered Steel Building?

Pre-engineered steel buildings are steel structures built over a structural concept of primary members, secondary members, roof and wall sheeting connected to each other and various other building components.

These buildings can be provided with different structural and non-structural additions such as skylights, wall lights, turbo vents, ridge ventilators, louvers, roof monitors, doors & windows, trusses, mezzanine floors, fascias, canopies, crane systems, insulation etc., based on customer requirements. All steel buildings are custom designed to be lighter in weight and high in strength.

Model of Pre-Engineered Steel Buildings
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 0
Applications of Pre-Engineered Steel Buildings

Pre-Engineered Buildings are the most flexible solutions for contractors and owners. With advantages of low cost, high durability, perfect quality control and fast erection; PEBs are used for various applications including factories, warehouses, logistics centers, showrooms, shopping malls, schools, hospitals, and community buildings.

Industrial Applications
  • Factories
  • Workshops
  • Warehouses
  • Cold Storages
  • Steel Mills
  • Assembly Plants
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 1
Commercial Applications
  • Showrooms
  • Supermarkets
  • Offices
  • Shopping Centers
  • Exhibition Halls
  • Restaurants
  • Logistic Centers
  • Multi-purpose Buildings
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 2
Public & Other Applications
  • Schools
  • Hospitals
  • Conference Halls
  • Laboratories
  • Museums
  • Stadiums
  • Farms
  • Utility Shelters
  • Pump Stations
  • Aircraft Hangars
  • Airport Terminals
Why Choose Pre-Engineered Steel Buildings?
1. Cost Savings

Price per square meter can be 25%-30% lower than conventional steel buildings. Site erection cost is low because of faster erection times and easier erection process.

2. Quick Erection

All steel components are fabricated at the factory and linked by bolts at the site. The erection process is fast, step by step, easy to install and requires simple equipment. 60% less construction time required compared with traditional R.C.C (reinforced concrete) building.

3. Flexibility

Pre-engineered steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.

4. Energy Efficiency

Pre-engineered buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recyclability.

Components of Pre-Engineered Steel Building

Pre-engineered metal buildings consist of the following components:

  • Primary Members / Main Frames
  • Secondary Members / Cold Formed Members
  • Roof & Wall Panels
  • Accessories, Buyouts, Crane System, Mezzanine System, Insulation, etc.
  • Sandwich Panels
Primary Members / Main Frames

Primary members are the main load carrying and support members of a pre-engineered building. The main frame members include columns, rafters and other supporting members. The shape and size of these members vary based on application and requirements.

Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 3
Secondary Members / Cold Formed Members

Secondary structural framing refers to purlins, girts, eave struts, wind bracing, flange bracing, base angles, clips and other miscellaneous structural parts. Purlins, girts and eave struts are cold formed steel members with minimum yield strength of 345 MPa (50,000 psi) conforming to GB/ISO/CE standards.

Roof & Wall Sheets/Panels

Standard steel panels are 0.3, 0.4, 0.5 mm or 0.6 mm thick with minimum yield strength of 345 MPa. Steel panels are hot dipped and galvanized with zinc or zinc-aluminium coating. Base material is pretreated before applying corrosion resistant primer and top coat.

Other Building Accessories

Other building accessories include anchor bolts, fasteners (bolts, nuts, turnbuckle, expansion bolts), gutters, downspouts, doors, windows, ventilators, skylight panels, louvers and all other building-related materials.

Manufacturing Process and Method Statement

The purpose of method statement is to describe the guidelines and methodology followed during fabrication, blasting, painting and supply of pre-engineered structure for steel building projects.

A: Material Receiving Procedure
  • Verify receiving documents and material quantity
  • Submit for QC inspection
  • Visual inspection for surface condition and damages
  • Dimensional inspection for length, width, depth, thickness
  • Document verification and preparation of inspection report
B: Preparation of Material

Preparation of Plates:

  • Transfer drawings to storage devices using expert software
  • Copy drawings into plate processing machine
  • Automated processing according to NC files
  • Punching of part marks, drilling, and plasma cutting

Preparation of Beams/Tubes:

  • Fabrication drawings prepared by design department
  • Automated cutting and drilling machine processing
  • Transfer to fit-up section after completion
C: Fit-up
  • Fabrication drawings issued for execution
  • Fit-up of prepared beams and connection details
  • Fixation of end plates, gusset plates, stiffeners by tack welding
  • QC inspection after fit-up completion
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 4
D: Welding & Grinding

Submerged Arc Welding Procedure:

  • Plan jobs for welding
  • Clean welding locations free of dust, oil, grease
  • Set wire feed and voltage parameters
  • Maintain fillet size according to GB50661-2011 standard
  • Remove spatters and slag after welding
  • Grind burrs, sharp edges and excessive reinforcements
  • QC inspection

MIG Welding Procedure:

  • Similar procedure as submerged arc welding
  • Maintain fillet size parameters per standard
  • Post-welding cleaning and grinding
  • QC inspection
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 5
E: Blasting
  • Tool Box Talk performed for every task
  • Working area barricaded with safety notices
  • Material handling and preparation prior to blasting
  • Automated blasting process achieving SA 2/2.5 Grade
  • Full PPE required for personnel
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 6
F: Painting of Fabricated Material
  • QC inspection of blasted surfaces
  • Ambient condition checks before application
  • Surface temperature and humidity monitoring
  • Application by Airless spray method
  • Wet Film Thickness monitoring
  • Three-coat painting system with touch-up after erection
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 7
G: Loading and Shipping
  • Receive finished components from painting department
  • Proper storage job-wise in yard
  • Arrange trucks from contract companies
  • Loading after clearance confirmation
  • Documentation maintenance
Quality Standards & Control

With 20-year warranty in the steel building industry, our company maintains strict quality standards. We have acquired ISO9001 and CE certificates and follow related standards for design and fabrication of steel buildings.

Fillet Weld Size Standards

Purpose: To ensure quality of fillet weld, meeting technical requirements of welded members and improve fabrication standardization.

Application Scope: Applies for design, fabrication and inspection of fillet weld size.

Fillet Weld Leg Size Requirements
Parameter Requirement
Minimum Fillet Weld Size K ≥ 1.5×t (t = thickness of thicker welding member)
Maximum Fillet Weld Size K ≤ 1.2t (t = thickness of thinner welding member)
Edge Welding When t ≤ 6mm, K ≤ t; When t > 6mm, K ≤ t-(1~2)mm
Circular/Trench Holes K ≤ (1/3)d (d = diameter of hole)
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 8 Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 9
Selection of Fillet Weld Size
Form of Fillet Weld Leg K Value Note
Fillet weld without groove K=(0.7~1)t and ≤15mm For most steel structure buildings
Fillet weld without groove K=(0.5~0.6)t For strengthening ribs and secondary members
Fillet weld with groove (CJP and PJP) K=t/4 and K≤10mm For most steel structure buildings
Fillet weld with groove (CJP and PJP) K=t/2 and K≤10mm Important members (crane beams)
Minimum Fillet Weld Size Chart
Parent Metal Thickness (t) (mm) Minimum Fillet Weld Size
t ≤ 6 3 (minimum 5 for crane beam)
6 5
12 6
t > 20 8
Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 10
H Section Manufacturing Equipment and Process

Complete manufacturing process: Steel plate cutting → H section assembly → Automatic welding → H section strengthening → Assembly → Manual welding → Shot blasting → Painting → Storage

I. Steel Plate Cutting

Quality assurance and material saving oriented cutting using CNC equipment with high purity gases for smooth, flat cutting surfaces without notches and slags.

Equipment Name Model No. Application Feature
Portable CNC Fire-cutting machine CNCDG-1530 Steel plate cutting (5-100mm), beveling of edge
Straight flame cutting machine DZCG-4000A Steel plate cutting (5-100mm), Y flange plate, web plate cutting
CNC cutting machine CNC-4000C Steel plate cutting (5-100mm), irregular component cutting
Radial drilling machine Z3050*16/1 Maximum drilling diameter φ50mm, bolt-connection holes
II. H Section Steel Assembly

Assembly on imported H section production line with hydraulic positioning system and CO2 gas shielded welding for fixation.

III. Automatic Welding

Gantry-type submerged arc automatic welding machine for H section steel members with preheating for ultra-thick plates.

IV. H Section Steel Strengthening

Correction of flange flatness and perpendicularity using specialized strengthening machines with controlled flame temperature (600~800ºC).

V-VIII. Assembly, Welding, Blasting & Painting

Complete process including simulated assembly, manual welding, shot blasting to Sa2.5 Grade, and painting with specified coating thickness.

Welding Groove/Beveling Standards
Purpose & Application Scope

To ensure welding quality, meet technical requirements, and improve fabrication standardization for groove joints in various welding methods.

Design of Welding Groove

Key considerations for groove design:

  • Minimize amount of filler metal
  • Easy for beveling
  • Convenient for welding operation and slag removal
  • Minimize welding stress and deformation
Groove Direction Regulations

Detailed specifications for butt welding on H section rafter/column, box column, and construction site welding with specific groove orientation requirements.

Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 11 Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 12 Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 13 Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 14 Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 15
Welding Groove Form Marking

Standardized marking system for welding method, penetration type, single/double side welding, and backing material type with comprehensive chart references.

Customized Size Pre-Engineered Steel Structure Building with 50 Years Life Cycle and 60 Days Construction Period 16